Our Process

Every phase of the clean, from the build to the handover.

Post construction cleaning works best in stages, timed to your construction schedule. Here is what we do at each stage, how we handle windows and dust, and where an optional clean during the build makes sense.

Optional

Between-trades cleans

During the build, whenever a trade finishes and the next is about to start

On larger or longer projects, a lighter clean between trades keeps dust and debris from building up and from getting worked into finished surfaces. You choose how many, and we schedule them around your trades.

  • Remove offcuts, packaging and bulk debris so the next trade has a clear space to work
  • HEPA vacuum fine dust after drywall sanding and other dusty trades
  • Clear sills, ledges, vents and floors so dust is not carried from room to room
  • Keep stairs, entries and walkways clear for the trades coming through
Phase 1

Rough clean

Once the major trades are finished, before final finishing and touch ups

The rough clean takes the site from a work zone to a space that can be finished. It focuses on the big, visible mess and on getting the heavy dust out before it settles into the finishes.

  • Remove construction debris, packaging, offcuts and leftover materials
  • Dust all surfaces from the ceiling down, then sweep and HEPA vacuum floors
  • Dust window frames and glass, and peel protective film and stickers from fixtures and glass
  • Clear vents, sills and ledges where dust collects
  • Clean around fixed equipment and tools without damaging finished work
  • Set aside sharp or hazardous waste for proper disposal
Phase 2

Final clean

After paint, flooring and cabinetry are done, ideally a day or more after the rough clean so dust has settled

The final clean is the detailed clean that prepares the space for handover. We work top to bottom and room to room, and match the method to each surface.

  • Detail clean cabinetry inside and out, plus tracks, handles and hardware
  • Clean interior glass, window frames, tracks and sills, and remove paint specks and adhesive
  • Clean and disinfect kitchens, bathrooms, fixtures and countertops with surface safe products
  • Clean flooring by material and scrub grout lines
  • Wipe baseboards, doors, trim, switches, vents and fans
  • Clean mirrors, stainless steel and hardware until streak free
Phase 3

Touch up clean

A few days after the final clean, ahead of the walkthrough or handover

Fine dust keeps settling for days after the main clean. The touch up clean catches it, along with the marks left by last minute work and foot traffic, so the space looks right on the day it is handed over.

  • Re wipe surfaces where dust has resettled
  • Remove fingerprints, smudges and streaks from glass, mirrors and doors
  • Spot clean floors marked by traffic or late work
  • Check the space top to bottom and run a final walkthrough
Windows

How we handle windows and glass

Glass is one of the first things a buyer or inspector checks, so it is cleaned at every phase, not just once.

Rough clean

Prep the glass

Dust frames and glass, and remove stickers and protective film. Adhesive residue is left for the final clean so we do not smear it across the glass.

Final clean

The detailed clean

Interior glass, frames, tracks and sills cleaned thoroughly. Paint specks and adhesive are removed with products that will not scratch the glass or damage the frame.

Touch up clean

Last look

Fresh smudges and streaks removed after the dust has settled, so the glass looks clear when buyers, inspectors or owners walk through.

Exterior glass can be added to a project on request. Mention it when you ask for a quote and we will confirm access and scope.

Dust Control

Why the order matters

Construction dust is fine, it travels, and it keeps settling. The sequence we follow is built around that.

Top to bottom, always

We start at the ceiling and finish at the floor, so dust we knock down is cleaned up once, not twice.

Dry first, wet second

Loose dust is vacuumed and dry wiped before any wet cleaning, so it never turns into a film on glass, counters or flooring.

HEPA filtered equipment

Fine construction dust is captured by HEPA filtration instead of being pushed back into the air to settle on finished surfaces.

Time for dust to settle

Fine dust can take days to settle. That is why the work is split into phases, with the final clean after the rough clean and a touch up after that.

Tell us where your project is in the build and we will recommend the right phases.